![]() | |
| Published by UltraBac Software | Q2 - 2009 |
Technical Tip on "Future Times"Quickly Confirm Scheduled Backups: After configuring a scheduled backup job, it is highly recommended that the user confirms the job is scheduled to run at the set times requested. An easy way to perform this task is by using the "Future Times" screen in the UltraBac Scheduler. To check the Future Times:
|
| Copyright © 2009 UltraBac Software Phone 425-644-6000 |